Manufacturing Base
Min. Order Quantity
Global Export
Annual Capacity
Whether engineered for 60-meter clear spans, 50-ton dynamic crane fatigue, or airtight thermal envelopes, nothing is left to jobsite improvisation. Every assembly is modeled in Tekla 3D, verified against international codes, and trial-fitted before a single plate is cut.
01
Steel Structure Warehouse
Portal frame · clear span to 48 m
View system
02
Industrial Workshop
Overhead cranes 5–100 t
View system
03
Multi-Story Steel Building
Column grid 8–15 m · bolted dry frame
View system
04
Poultry & Livestock Building
Hot-dip galvanised · 12–36 m clear span
View system
05
Steel Structure Bridge
Truss & box girder · 30–120 m span
View system
06
Cold Storage Building
PIR / PU envelope · +10 to −40 °C
View system
07
Public Arena & Stadium
Space frame · 30–150 m clear span
View system
08
Roofing & Wall Sandwich Panels
PU · PIR · rock wool · 40–250 mm
View system
We don't just build steel structures. We hold a tolerance from the Tekla model to the last bolt hole, then ship the whole set so the site only has to assemble it.
CNC laser cutting and automated H-beam welding lines hold millimetre tolerance across the run, not just on the sample piece.
Ultrasonic testing on welds, Sa 2.5 shot blasting and a heavy-duty epoxy plus PU coating system for extreme environments.
From 3D modelling to container loading and on-site installation guidance, one team stays on the file until the last crate is open.
Twenty-four site records, from a 1,800 m² warehouse in Adelaide to a 21,000 m² workshop in Salvador. Same seven stages, same drawings, forty countries of paperwork.
Every project runs the same seven-stage procedure, whether it is 1,800 m² of warehouse or 21,000 m² of workshop. You always know which stage you are paying for, and what has to be signed before the next one opens.
Clarify your specific project needs, or send structural drawings for our engineering team's initial evaluation.
We calculate the precise bill of quantities and issue a formal quote. Offline visits or remote video factory inspections are both welcome.
Once terms are agreed we sign the contract and proforma invoice. A 30% T/T deposit activates the project.
Deep 3D modelling in Tekla, sent to you for review. Final steel weight is based strictly on the model's bill of materials.
On drawing approval, manufacturing starts. Lead time is scheduled to the scale and complexity of your project.
Over 30 pre-shipment checks run in our own factory before anything is packed, against the structural standards agreed for the project.
On successful inspection the balance is settled. We then pack, load the containers and dispatch directly to your site.
Give us the location, span, length, eave height, insulation and any crane capacity. What comes back is a bill-of-quantities based quotation, not a square-metre guess.
Taian City, Shandong Province, China